Posts Tagged ‘OEE’

Going to the work…


by: Evan Miller
Thursday, February 19th, 2009

Ron Pereira over at LSS Academy wrote a great post about the Japanese phrase Genchi Genbutsu. He quotes Jon Miller, a Lean consultant who is also fluent in Japanese, as translating genchi genbutsu to “actual place, actual thing”.

Pereira’s post caught my attention because he opened with this quote from the father of the Toyoto Production System, Taiichi Ohno: “Data is of course important in manufacturing, but I place the greatest emphasis on facts.”

As a leader in a company that specializes in “Turning Data into Knowledge” I suppose I should feel a little threatened by this statement. On the contrary I think it is spot on.

Real-time visibility to data is a tremendously useful simply because you can’t be everywhere at once. Live OEE Dashboards, real-time control charts, and instantaneous email alarms can let you know when something has changed. And they can tell you if the change is statistically significant so that you’re not reacting in the wrong way to random variation.

But ultimately you have to get up from your desk and go to the work to see for yourself.  All these tools can help you know when and where to go, but they won’t do the work for you.

Pereira’s post includes a great story about what a Toyoto Engineer learned by going to the work.

Where are the weak links in your organization? Do your people know when they have a problem? Do they go to the work when they need to?

Please comment, schedule a conversation, or call us at 800-958-2709.

OEE Dashboards…


by: Evan Miller
Wednesday, February 11th, 2009

Since writing the series of posts about calculating OEE, I’ve been thinking about how you can best use OEE data to drive improvements in throughput and profitability.

Recently I showed this OEE Dashboard to a customer.

He said to me,

“Evan, this is exactly what I’m looking for. Today we’re collecting OEE data on paper and in spreadsheets. It is so cumbersome because we have to compile and massage the data, and by the time we actually see a problem it is too late to do much about it. If we could display this on the plant floor and people could react right away, it would make a huge difference.”

I have no doubt that he is absolutely right: making the data visible in an understandable form will make a huge difference.

Here is the “Yes, And…”

Yes, making the data visible has a positive effect. And with the right tools you can convert that data into knowledge about your organization so your people can focus their efforts on the right things.

Here is a new video I’ve just posted on YouTube that walks you through how you can drill into OEE data for more knowledge.

What do you think? Would being able to visualize and drill into OEE data like this be useful at your plant? How would you use this?

Please comment, schedule a conversation, or call us at 800-958-2709.

OEE Defined - Quality…


by: Evan Miller
Monday, February 2nd, 2009

If you’re just tuning in, this post is part of a series aimed to summarize Overall Equipment Effectiveness (OEE) in clear, unambiguous language. This series started a few days ago with comments about a feature story in Industry Week magazine about OEE.

We’ve been working our way across the formula for OEE:

OEE = Availability * Performance * Quality

In this post we’re finally ready to define Quality.

Quality

As with Availability and Performance, Quality is a ratio, expressed as a percentage.

Quality = Number of Good Pieces / Total Pieces Produced

We know the total number of pieces produced from the examples in the prior posts. We just need to count up the number of defective pieces and calculate the number of good pieces.

Total pieces produced 1187
Number of defects 78
Number of good pieces 1109

Quality = Good Pieces / Total Pieces Produced

Quality = 1109 / 1187

Quality = .9342 (Multiply by 100 to express in percentage = 93.4%

The number of good pieces should include only those pieces that went through the process without rework or adjusting. In other words, Quality should be a measure of First Pass Yield.

How do you calculate Quality at your facility?

Please comment, schedule a conversation, or call us at 800-958-2709.

OEE Defined - Performance…


by: Evan Miller
Monday, February 2nd, 2009

In my last post I began digging into the details of calculating OEE (Overall Equipment Effectiveness). The formula for calculating OEE is straightforward:

OEE = Availability * Performance * Quality

But each of these key components relies on some standard operating definitions. In the last post we looked behind the scenes at Availability. This post dives into the definition of Performance.

Performance

As with Availability, Performance is a ratio, expressed as a percentage. Unlike Availability, Performance can be calculated based on either the Ideal Cycle Time or the Ideal Run Rate.

Here are the components of Performance:

Performance = Ideal Cycle Time / (Operating Time / Total Units Produced)

Ideal Cycle Time is the optimal or expected time that you can expect to achieve with your process. Some people call this the Theoretical Cycle Time.

You can also flip this calculation upside down if you know the Ideal Run Rate instead of the Cycle Time. (Run Rate is the reciprocal or inverse of Cycle Time.)

Performance = (Total Pieces/ Operating Time) / Ideal Run Rate

Since the Ideal Run Rate and Ideal Cycle Time are theoretical values, and they may be inaccurate, Performance is always capped at 100%. That way if you underestimate the ideal, it will have a limited impact on OEE.

In the example in the last post we calculated Operating Time as 343 minutes. This was based on the following data:

Total time in shift 480 minutes (8 hours)
Machine setup 95 minutes
Lunch break 30 minutes
Other Down Time 17 minutes

Planned Production Time = 450 minutes (480 time in shift less 30 minutes for lunch break)

Actual Operating Time = 338 Minutes (Total time in shift [480 Minutes] - scheduled breaks [30 Minutes] - machine setup [95 minutes] - Other down time [17 minutes]).

With just two more pieces of information, we can calculate Performance:

Ideal Run Rate 4 pieces per minute
Total Pieces Produced 1187 pieces

Performance = (Total Pieces/ Operating Time) / Ideal Run Rate

Performance = (1187 / 338) / 4

Performance = .8787 (Multiply by 100 to express in percent = 87.9%)

In some situations it may be more convenient to calculate the Performance based on Ideal Cycle Time. For example, we could use this same example and express the ideal cycle time as one unit produced every 15 seconds.

Ideal Cycle Time 15 seconds per unit
Total Pieces Produced 1187 pieces

Performance = Ideal Cycle Time / (Operating Time / Total Units Produced)

ideal cycle time = 15 seconds = 0.25 minutes (we need to convert to the same unit of time measurement)

Performance = 0.25 / (338 / 1187 )

Performance = .8779 (Multiply by 100 to express in percent  = 87.8%)

How do you calculate Performance at your facility?

In the next post we’ll look at what goes into calculating Quality. In the meantime comment, schedule a conversation, or call us at 800-958-2709.

OEE Defined - Availability…


by: Evan Miller
Friday, January 30th, 2009

There’s an old adage that you need to know the rules before you break the rules. That applies to everything from playing jazz to running a business.

I got to thinking about that idea after reading Industry Week’s cover story on OEE (Overall Equipment Effectiveness). The IW story discusses the benefits of OEE, and even gives a definition of OEE:

OEE tells users the percentage of time that equipment, when running or required for production, is producing good-quality products at an acceptable rate. It is the product of three ratios, or submetrics: machine availability rate, performance or run rate, and the quality rate. It is calculated by multiplying availability rate by production rate by first-pass quality rate.

This is a good textbook definition of OEE, but it leaves some gaps. This post and others in this series will fill some of those gaps. Once we fill in the gaps in the text book definition we’ll be in a better place to consider if we want to break any of the rules.

Mr. Sanders, my 5th grade teacher, was forever having us convert a story problem into an equation.  Here is what that paragraph looks like as an equation:

OEE = Availability * Performance * Quality

Future posts will go into more detail on Performance and Quality. Today let’s look at Availability in more detail.

Availability

The formula for Availability is simple, but it relies on some operational definitions. Here are all the components for calculating Availability:

Availability = Actual Operating Time / Planned Production Time

Planned Production Time is the time any piece of equipment is scheduled for operation.

Actual Operating Time = Planned Production Time - Down Time.

Down Time is a measure of unscheduled production stops.

Down Time includes the time required for machine setup and changeover, or losses due to equipment breakdowns and material shortages.

We do not include planned shutdown time in this calculation. For example, If a machine is scheduled to run from 10am until 5pm on a specific day, then the Planned Production Time is 7 hours, or 420 minutes. (All of these times are usually measured in minutes or hours.) If a machine normally runs while an employee is at lunch, then the employee’s lunch time is included in the Planned Production Time. If the machine is scheduled to be shut down while the employee is taking a break, then the break is not included in Planned Production Time.

Down Time is usually measured in minutes.  Consider establishing a policy for a threshold for what constitutes a trackable event. For example, you may wish to track stoppages of more than 5 minutes so that you don’t bother with every little hiccup in the system.

Availability, like the other components of OEE, is reported as a percentage, so after we calculate the ratio we just multiply it by 100. Here is a typical calculation:

Total time in shift 480 minutes (8 hours)
Machine setup 95 minutes
Lunch break 30 minutes
Other Down Time 17 minutes

Planned Production Time = 450 minutes (480 time in shift less 30 minutes for lunch break)

Actual Operating Time = 338 minutes (450 minutes - 95 minutes for machine setup and 17 minutes unscheduled down time.

Availability = Actual Operating Time / Planned Production Time

Availability = 338 / 450

Availability = 0.7511 (multiply by 100 to express as a percent = 75.1% )

This is the text book definition of Availability. How do you calculate it at your facility?

In the next post we’ll look at what goes into calculating Performance. In the meantime comment, schedule a conversation, or call us at 800-958-2709.

OEE at Industry Week…


by: Evan Miller
Monday, January 26th, 2009

Industry Week magazine did a great cover story on OEE (Overall Equipment Effectiveness) in the February Issue.  A couple of key take-aways:

  • Adapt OEE to your business situation
  • Use the OEE data to drill in and drive improvements
  • Don’t optimize OEE at the expense of the business

These ideas point to why GainSeeker Suite is getting so much traction as a tool to deploy OEE.

First, almost every place we’ve deployed OEE has a slightly different definition of the metric. GainSeeker’s flexibility to define and calculate data makes this a piece of cake.

Second, GainSeeker Suite provides great tools for drilling into - slicing and dicing - data.

Third, OEE should be only one of your key business metrics. If you set these up properly (especially in GainSeeker with desktops and dashboards) you can see how OEE is improving and test whether it is actually impacting other critical measures.

I’d like to see more discussion on how automation can help increase the reliability and timeliness of OEE data. What we’ve found as we talk to our customers is that data reliability is a huge issue. Again, GainSeeker Suite can be an important tool for getting better data faster.

Finally, GainSeeker’s Dashboard Module can post OEE data information visually on the floor and greatly increase the visibility of the metric.

What are you doing with OEE?

Comment, schedule a conversation, or call us at 800-958-2709.

Real-time OEE Dashboards focus on cost & reduction


by: Evan Miller
Monday, December 22nd, 2008

We’ve been getting some good press recently for some work we’ve been doing with a well know foods company. This project implemented a real-time Overall Equipment Effectiveness (OEE) dashboard so they could collect and report on Key Process Indicators (KPIs).

As the project manager states, “The Hertzler System’s color-coded and real-time display of production line performance has given our operators a heightened sense of ownership over the plant’s performance. Rather than analyze performance reports the next day, employees can act on real-time data from the performance boards, leading to faster issue resolution and better overall performance. Furthermore, this system will allow us to maintain a historical record of our performance, which will guide our long-term improvement efforts.”

This project actually began several years ago when we began collecting package weight data from check weighers on the production line. The company used this data to help reduce overpack and save money.

With that success under our belts, they asked us to help them collect downtime and other data associated with OEE, and to display these Key Process Indicators (KPIs) automatically on flat panel displays on the factory floor.

Corporate had mandated that they get this information out to the workforce, and they were manually updating white boards with markers at the end of each shift. It was a time consuming, error-ridden process.

Here is a picture we took from inside the plant showing the shop floor data collection station, with the large flat panel display suspended from the ceiling.

OEE Dashboard with Weight Control and Downtime Data Collection - Shop Floor Photo

And here is a screen capture of the OEE Dashboard display. This was custom-developed for this customer and combines data from a variety of sources. The column labeled Downtime Reason scrolls to show all of the reasons for downtime during a particular hour.

Screen Capture of Sample OEE Dashboard

Research shows that real-time data is one of the key strategies that differentiates Best-in-Class performers. You can read more about that research in this Aberdeen Report on Event Driven Manufacturing Intelligence and in our accompanying white paper on the The Role of Real-Time Data in Improving Profitability and Customer Satisfaction.

Getting to OEE…


by: Evan Miller
Monday, November 24th, 2008

For the last couple weeks we’ve been working on an OEE (Overall Equipment Effectiveness) project for a new client. When I sat down over lunch today with our CTO and Alpha Geek, Byron Shetler, he explained that the biggest issue - as usual - is getting the data. “This company doesn’t have an OPC/PLC network in place yet, so everything we did last week was around manual data entry.

“I set up a couple of GainSeeker templates to collect downtime, scrap, and efficiency, and we’re storing that as either variable or defect data every hour on every machine.” Byron pointed out that once this customer puts his OPC factory network in place we’ll automate the data collection piece.

By the end of the day Friday (after less than a week on site) Byron had a couple of dashboards in place. He couldn’t bring back any screen caps of their dashboard, but it sounds a lot like what you’ll see on the Dashboard page on our website.

GainSeeker Enterprise Dashboard - OEE Example

GainSeeker Enterprise Dashboard - OEE Example

Byron reported that the customer was pretty happy that we got in and out so quickly. But more important, he’s excited about getting an hourly update on OEE, Quality, Downtime and Efficiency, and being able drill into any of those metrics by machine or operator or downtime reason, or scrap reason.

Byron reported: “This customer is pretty sharp, and he was practically rubbing his hands together in anticipation of getting his hands on that data. Being able to see the big picture and then drill into various components to understand the root cause is a huge opportunity for this company.”

In addition to linking to the OPC network, once it is in place, Byron also sees potential to feed data back from GainSeeker to the customer’s AS400 business system. “Right now the customer has a couple people who sit down and type data from paper records for scrap and production rates back into the primary business sytem.

Let's Talk

Schedule a conversation
Call us at 800-958-2709

News

Read our blog

Events

4/12/10: Food Safety Summit Conference and Expo

4/28/10: Quality Expo South

Press Releases

2/12/10: Hertzler Systems releases new version of popular GainSeeker Suite with new Dynamic Reports module and expanded dashboard features

10/7/09: Hertzler Systems releases new case study on "Creating a data-driven, fix-to-root-cause culture"

9/3/09: Hertzler Systems to host web seminar for Foods Industry executives

Visit our News Center

Articles