Tech Tip: GainSeeker Dashboard Control – Date/Time Control

You may be asking yourself why I thought something as simple as the Date/Time control on Dashboards is blog worthy.  At surface level , it looks like just another date/time feature. If you have not used it before, that could be a logical assumption.  What I want to...

Creating a Data-Driven Culture Results in 90% Reduction in Scrap

Multi-plant Manufacturer Reduces Escaped Defects from 8% to Less Than 0.5% A multi-plant manufacturer of metal products was ready for a change. They enjoyed an excellent reputation in the marketplace, but the good reputation came at a price. Internal scrap and rework...

GainSeeker Suite Enables Dramatic Decrease in Cost of Goods Sold

Consolidated Container Company (CCC) is one of the largest suppliers of rigid plastic packaging in North America, with a national footprint consisting of 59 rigid plastic packaging manufacturing facilities and 2,300 employees. Many of their facilities were using...

Food Manufacturer Reduces Waste by Over 70% in Six Weeks

Multi-plant pizza and mushroom manufacturer gains visibility into production processes and generates 70-80% reduction in waste and overfill in 6 weeks. Current Way of Working Was Perceived as Good Enough Dan Wadyka, Assistant Director of Quality Control at Giorgio...